Answer ALL questions. Look for any feedback given if you get an answer incorrect. Keep choosing an answer until you get it correct. CORRECT or INCORRECT answers are indicated at the TOP of the page. A score is given at the TOP of the page when the exercise has been completed.
A work colleague arrives on site late and not in a good mood. Identify the appropriate initial action taken by the supervisor.
issue a formal letter
have a quiet word during breaktime
send the worker home
forget the matter on this occasion
As part of a large housing development project, you expect a large delivery in a couple of days which is likely to block residential access for part of that day. Identify an appropriate action in this regard.
issue written notes to each affected dwelling
state the information on your company website
as the obstruction will only be for part of the day, no action is necessary
telephone each affected dwelling to give notice of the obstruction
Identify the most appropriate method of careful monitoring of materials usage on a large, complex installation project.
CPN diagrams
Spreadsheets
Barcharts
Take-off sheets
Identify the best term that describes the process of all concerned contractors working towards an equitable solution to a major construction problem.
negotiation
abbreviation
forming
arbitration
Identify the appropriate method to determine an electrical apprentices Health and Safety awareness for worksites.
ECS card
JIB card
Trades Union card
HSE card
Identify the major consideration when planning the allocation of Inspection and Testing tasks on completion of a major industrial installation project.
availability of staff
competence level of staff
staff must possess C&G 5357 qualification
staff must have JIB membership
Which one of the following is most likely to be affected by the failure of sub-contractor to not meet their contractual obligations during a large project.
the CPN plan
the main contractors' reputation
the income of the main contractor
planned delivery times for the entire project
Identify the document that has to be completed when a formal change is made to an existing contract.
Daywork sheet
Variation order
Specification
Take-off sheet
Identify the primary purpose of a visitors book on a busy worksite.
for fire and emergency contingency planning
to see who has been visiting
for insurance purposes
for ensuring adequate facilities on site
Identify the colour of a 230v AC plug/socket to BSEN60309-2, as found on a worksite.
red
yellow
blue
violet
Identify the colour of a 110v AC plug/socket to BSEN60309-2, as found on a worksite.
red
yellow
blue
violet
Identify the colour of a 400v 3-phase AC plug/socket to BSEN60309-2, as found on a worksite.
red
yellow
blue
violet
Identify the nature of the information likely to be found on a 'programme of works'.
accessories needed for the job
length of time for temporary supplies
specifications of the job
invoice information
Identify the important consideration to be given when selecting accessories for use installation in areas such as a bathrooms and saunas.
suitable IP rating for those locations
only PVC accessories to be used in these locations
ensuring accessories can be earthed
accessories should be Risk Assessed prior to installation
Identify the document to be checked and signed when a delivery arrives after being ordered from an online supplier, to ensure the delivered goods are in good condition.
delivery note
variation order
purchase order
original order
Identify the document to be checked when a delivery arrives after being ordered from an electrical wholesaler, to ensure the original order is complete.
delivery note
variation order
purchase order
invoice
Identify the best resource for identifying any labour and materials/accessories requirements for a large building and installation contract.
specifications and programme of works
jobsheets and barcharts
CPN and site plans
GANTT chart and contract
As part of a large industrial installation nearing completion, identify the most appropriate location for the delivery of a large drum of 240mmsq SWA (Steel-wire armoured) cable.
close to the point of utilization
at the main entrance to the worksite
at the secure site store
outside your site office
Identify the most appropriate location for storing a selection of electrical powertools and steel conduit-bending equipment on a busy worksite.
in your work van
in a secure store
in the site office
in an empty storeroom on site
Select the only Statutory regulation from this list, the remaining being non-Statutory 'guidelines'.
EaW 1989
BS7671:2018 Wiring Regulations
BS7671:2018 On-Site Guide
GN3
identify the Act that defines 'pay and conditions' for you working for your company.
equality Act
Human rights Act
Employment Rights Act
data Protection Act
'Weather conditions' when completing a long contract could be definined as .................. if it were to impact on the completion date.
an influential factor
an unexpected factor
a changable factor
a mitigation factor
The 'delivery and availability of materials' when completing a long contract could be definined as .................. if it were to impact on the completion date.
an influential factor
an enhancement factor
a changable factor
a determination factor
The availability of 'suitable personnel' when completing a long contract could be definined as .................. if it were to impact on the completion date.
an influential factor
an enhancement factor
a changable factor
a mitigating factor
Identify the method used to identify the type electrical accessories required when referencing a scale Layout drawing/plan?
BSEN graphical symbols
parts catalogue
Scale, ruler and calculator
Contract
Tools and equipment that perform as the manufacturer intended can be referred to as ..............?